The AI Economy's Bottleneck: Electricity

Find Power Before Your Competitors.

Every AI company is hunting for power. The grid is opaque. We analyze thousands of interconnection filings so you can find spare capacity in milliseconds.

PJM, ERCOT, CAISO, MISO
10,000+ Substations
Queue Position Data
grid-capacity
# Find available grid capacity for new data center
0K+
Substations Indexed
Across all major ISOs
0K+
Queue Filings Parsed
PDF documents processed
0
Grid Regions
PJM, ERCOT, CAISO, MISO, SPP
0h
Data Freshness
New filings indexed daily
The Power Race

AI Needs Electricity to Survive

Microsoft, Google, and OpenAI are racing to secure power. The grid data they use costs millions. Now you can access it too.

Opacity

The Grid is a Black Box

THE PROBLEM

Grid capacity data is buried in thousands of PDF filings across regional ISOs. A substation in rural Virginia might have 50MW of spare capacity—but finding that information requires reading hundreds of documents manually.

GRID CAPACITY API

We parse every interconnection filing, capacity report, and queue update across PJM, ERCOT, CAISO, MISO, and SPP. Query by region, county, or minimum MW and get structured JSON in milliseconds.

PDFs parsed500K+
Hover to see solution
Queue Intel

Who's Ahead of You?

THE PROBLEM

When you find a promising substation, you need to know your position in the interconnection queue. Who else is trying to connect? What's their MW request? This intel is scattered across regulatory filings.

GRID CAPACITY API

Our Queue Intel tier shows you exactly who's ahead in line at any substation. See their company name, MW request, filing date, and estimated timeline. Know if you're fighting Google for the same power.

Filing updates24h
Hover to see solution
Speed

Millions for This Data

THE PROBLEM

Energy traders and infrastructure PE firms pay millions to consultants for this intelligence. By the time you get a report, the best sites are already claimed by Microsoft, Google, or Amazon.

GRID CAPACITY API

Get the same data via API for $50-$500 per query. Your site selection agents can programmatically scan every substation in a region and find opportunities before your competitors even start their search.

Per query$50
Hover to see solution
Why Data Centers Choose Us

The Power Intelligence Layer

Purpose-built for data center site selection, infrastructure PE, and anyone racing to secure grid capacity.

5 ISOs

Regional Coverage

Full coverage across PJM (East Coast), ERCOT (Texas), CAISO (California), MISO (Midwest), and SPP (Central). Each region normalized to a common schema.

10K+ Sites

Substation Capacity

Query available MW at any substation. Filter by minimum capacity, proximity to fiber, voltage level, and estimated interconnection timeline.

Real-time

Queue Position Intel

See everyone ahead of you in the interconnection queue. Company names, MW requests, filing dates, and current status. Know your competition.

x402

Agent-Native API

Built for autonomous site selection agents. MCP protocol and x402 payment integration. Your AI can find and pay for power data without human approval.

Daily

24-Hour Updates

New interconnection filings parsed within 24 hours of public release. Never search with stale data while competitors move faster.

API-First

Structured JSON

Raw PDF data transformed into clean, queryable JSON. No more regex parsing. Filter, sort, and analyze programmatically.

Three Steps to Power Intel

From query to actionable site intelligence in under 200 milliseconds.

01

Query by Region

Your site selection agent specifies the target ISO region, minimum MW requirement, and any other filters (county, voltage level, proximity to fiber).

// Find available capacity in PJM region
const results = await gridCapacity.query({
  region: "PJM",
  min_mw: 20,
  county: "Loudoun",
  voltage: "345kV"
});

// Returns in < 200ms
02

Get Substation Data

We return all matching substations with available MW, current queue depth, estimated timeline, and distance to nearest fiber backbone.

// Grid Capacity Response
{
  "substations": [
    {
      "name": "Ashburn-345kV",
      "available_mw": 47,
      "queue_depth": 3,
      "est_timeline": "18-24 months",
      "fiber_distance_mi": 0.3
    },
    {
      "name": "Sterling-230kV", 
      "available_mw": 32,
      "queue_depth": 7,
      "est_timeline": "24-36 months",
      "fiber_distance_mi": 1.2
    }
  ]
}
03

Deep Dive Queue Intel

For promising sites, query our Queue Intel tier to see exactly who's ahead of you. Company names, MW requests, filing dates, and current status.

// Get interconnection queue for specific substation
const queue = await gridCapacity.queueIntel({
  substation_id: "ashburn-345kv",
  region: "PJM"
});

// See who you're competing against
queue.entries.forEach(entry => {
  console.log(entry.company, entry.mw_request);
});
// "Microsoft", 100MW
// "Amazon Web Services", 75MW  
// "Unknown LLC", 50MW

Five Lines. Full Grid Intel.

Integrate Grid Capacity API in minutes. Find power before your competitors.

site-selection.ts
1import { GridCapacity } from '@gridcapacity/sdk';
2
3const grid = new GridCapacity({
4 apiKey: process.env.GRID_CAPACITY_KEY
5});
6
7// Find substations with 20MW+ available
8const sites = await grid.query({
9 region: "PJM",
10 min_mw: 20,
11 sort_by: "available_mw"
12});
13
14// Get queue intel for top result
15const queue = await grid.queueIntel({
16 substation_id: sites[0].id
17});
18
19console.log(`${queue.entries.length} ahead in queue`);
Simple Pricing

Pay Per Query.No Subscriptions.

Energy traders pay millions for this data. Get it for $50-$500 per query via x402 micropayments.

10K+
Substations
500K+
PDFs Parsed
5
ISO Regions

Capacity Scout

/api/v1/capacity
$50per query

Find substations with available MW

Target: Data Center Site Selection Teams

  • Query by region (PJM, ERCOT, CAISO, MISO, SPP)
  • Filter by minimum MW requirement
  • Available capacity per substation
  • Distance to fiber backbone
  • Estimated interconnection timeline
  • JSON response in < 200ms
Most Popular

Queue Intel

/api/v1/queue
$500per query

Full interconnection queue data

Target: Infrastructure PE & Bitcoin Miners

  • Everything in Capacity Scout
  • Full queue position for any substation
  • Company names ahead of you
  • MW requests per queue entry
  • Filing dates and current status
  • Historical queue movement data
  • Priority support

All queries return structured JSON. Data updated within 24 hours of new filings.

Volume discounts available for 100+ queries/month. Contact sales.

Customer Stories

Trusted by Power Hunters

From hyperscale data centers to Bitcoin miners, Grid Capacity API helps teams find power faster.

Speed
"We were spending $2M/year on consultants to find available grid capacity. Grid Capacity API gave us better data for $50 per query. Found our Virginia site 3 months faster than our competitors."
JM
James Morrison
VP Site Selection, Hyperscale DC Developer
Queue Intel
"The queue intel is invaluable. We saw Microsoft and Amazon were ahead of us at our target substation. Pivoted to an alternative site with better queue position. Saved us 18 months of waiting."
SC
Sarah Chen
Partner, Infrastructure Private Equity
Scale
"Our mining operation needs 50MW minimum. Before Grid Capacity, we'd spend weeks reading PDF filings. Now our site selection agent queries all of ERCOT in 200ms. We're expanding 3x faster."
MW
Marcus Williams
COO, Bitcoin Mining Operation
Common Questions

Grid Capacity FAQ

Everything you need to know about finding power for your data center or mining operation.

Query our Capacity Scout tier ($50) with your target region (PJM, ERCOT, CAISO, MISO, or SPP) and minimum MW requirement. We return all substations with available capacity, sorted by your criteria. You can also filter by county, voltage level, and proximity to fiber.

The Interconnection Queue shows everyone ahead of you in line for grid connection at a specific substation. Our Queue Intel tier ($500) parses thousands of PDF filings to show you the company name, MW request, filing date, and current status of every entity in the queue. This tells you if you're competing against Microsoft for the same power.

Every major tech company (Microsoft, Google, OpenAI, Amazon) is racing to secure power for AI data centers. Energy traders and infrastructure PE firms pay millions to consultants for this intelligence. The grid is opaque by design—capacity data is buried in thousands of PDF filings. We parse and structure it so you can query programmatically.

We currently cover PJM (East Coast, including Virginia's Data Center Alley), ERCOT (Texas), CAISO (California), MISO (Midwest), and SPP (Central). Each region has different interconnection rules and queue processes that we parse and normalize into a common API schema.

We parse new interconnection filings within 24 hours of public release. Capacity data updates weekly from utility reports. This is significantly faster than manually reading thousands of PDF documents or waiting for quarterly consultant reports.

x402 is a micropayment protocol that lets you pay per API call with cryptocurrency. No subscriptions, no minimums, no invoices. Your agent or script includes a payment proof with each request. If the payment is valid, you get the data. This is how AI agents can autonomously pay for data without human approval.

Find Power Before They Do

Microsoft, Google, and Amazon are racing to secure grid capacity. Get the same intel they use—for $50 per query instead of millions in consulting fees.

10,000+ substations
5 ISO regions
24h data freshness